Case Study for Pennsylvania ISCO Project Using Hydrogen Peroxide
A remediation company was contracted to perform a clean-up of an abandoned gas station in south central Pennsylvania. The consulting engineer and the remediation contractor selected a treatment program utilizing In-Situ Chemical Oxidation (ISCO) as the preferred treatment technology.
The scope and structure of the project required that a high volume of multiple chemicals be mobilized quickly, which created a significant operational and cost challenge for the contractor. USP Technologies developed a Total Chemical Management Program to efficiently and cost-effectively execute the project.